Motor register workbook

A free Excel file for every electric motor on your site, one line each: where it is, what the nameplate says, which bearings it takes, how it is protected, and when it is next due for service. Overdue motors turn red on their own.

What is in it

TabWhat it does
RegisterOne row per motor, 500 rows ready. A summary line on top counts motors, installed kW, and how many are overdue or due in the next 30 days. Filters on every column; the tag and the headings stay in view as you scroll.
SparesThe bearings you keep on the shelf, how many, and your minimum. It counts how many motors in the register take each bearing, and flags the ones to reorder.
ListsThe choices behind the drop-downs: criticality, status, mounting, IP, IE class, duty, starter. Add your own and the drop-downs pick them up.
How to fill itEvery column, and where to find it on the nameplate.

The columns

Columns shown in grey work themselves out from the others, so there is nothing to type in them.

Where it isTag, Location / line, Drives, Criticality, Status
NameplateMaker, Type / model, Serial no., Power, Unit, kW, Volts, Amps (FLA), Hz, rpm, Poles, Frame, Mounting, IP / enclosure, Ins. class, Efficiency, Duty, SF
BearingsDE bearing, NDE bearing, Grease
ProtectionStarter, Overload set (A), Overload check, Cable, Breaker / fuse
ServiceInstalled, Last service, Every (months), Next due, Due?, Notes

Filling it in

Start with the tags and locations only — one walk round with a clipboard. Fill in the rest the next time you are at each motor, beginning with the A-critical ones: those are the motors to keep a spare for. If you aren't sure what a line on the plate means, the nameplate guide goes through each one, and the IEC and NEMA frame charts turn a frame size into shaft and foot dimensions.

The first three rows are worked examples: type over them. One is overdue and one has its overload set for the wrong voltage, so you can see the flags working.

Why a spreadsheet

Most sites already keep one; it's usually missing the bearings and the service dates. This one keeps a fixed layout — one motor per row, a unique tag in the first column — so it can be sorted, filtered, printed and later imported into a maintenance system without retyping. We're building a maintenance planner that will read this file.